Theatre by the Lake - Keswick, Cumbria
Client: Thomas Armstrong
Year: 2007
Extension Project
Metalwork Solutions UK provided the structural steelwork extension to the current building. There were significant safety and access issues as the terrain and confined spaces were challenging. It is also located in a busy tourist area. A road closure was granted overnight by the local authority, so the work could be undertaken quickly, safely and with the minimum disruption to the locality.
Completed on time, within budget and without accident or incident.